Email: info@chintiyan.com
WhatsApp: +86-13125190225
Language
English
España
French
Products
5-50MW Manual / Semi Auto Solar Panel Production Line
This line handles single and double-glass modules, covers PERC, TOPCon, BC, HJT cells in sizes 156–230mm, and supports 3BB to 20BB busbars.
60-200MW Full-Auto Solar Panel Production Line
The 60-200MW production line is compatible with single/double-glass modules, supports 166–230mm PERC/TOPCon/BC/HJT cells, and offers 3–20BB busbars.
300-400MW Full-Auto Solar Panel Production Line
Fully compatible with single-glass and double-glass modules, supports 156–230mm PERC, TOPCon, BC, and HJT cells, and offers busbar configurations from 3BB to 20BB
500-750MW Full-Auto Solar Panel Production Line
The 500-750MW full-auto line is compatible with single/double-glass modules, supports 156–230mm PERC/TOPCon/BC/HJT cells, and 3–20BB busbars.
1GW Solar Panel Assembly Line
Compatible with conventional, double-glass, flexible, thin-film modules and 156–210mm cells (including busbar-free and N‑type), supports full, half, shingled, framed or frameless options.
Automated Battery Module PACK Assembly Line
The Automated Energy Storage Module & PACK Production Line is designed for manufacturing energy storage battery modules and PACKs, mainly applied in BESS, C&I ESS, and renewable energy storage systems.
Prismatic Energy Storage Module & PACK Production Line
The prismatic battery Module & PACK Production Line is designed for manufacturing liquid-cooled energy storage battery modules and PACK with prismatic cells, covering complete processes from cell loading to module assembly and PACK unloading.
Semi-Auto Battery Module PACK Production Line
The semi-automated battery PACK assembly line(Uptime for 4-8 PPM) combines advanced automation with manual operations to provide a cost-effective and flexible solution for producing high-quality battery pack. Annual capacity: 500 MWh–1GWh, optimized for the assembly of battery packs used in energy storage systems, and other high-demand applications.
Butyl Rubber Coating Machine
The coating equipment supports glass in tempered, semi-tempered, or non-tempered states. Cycle time is under 16 seconds; driven by linear motors, it achieves a repeatability of ±0.02 mm and supports a glue application width of 5–8 mm (with ±0.3 mm precision). Compatible with glass thicknesses ranging from 1.6 mm to 3.2 mm.
Prismatic Battery Pack Assembly Line
The Prismatic Battery Module & PACK Production Line is designed for manufacturing energy storage battery modules and PACKs with prismatic cells, at 8 PPM and ≥99% yield.
News
ChinTiyan Showcases Energy Storage Solutions at 2026 Wuhan Trade Fair
2026-11-20
U.S. Battery Manufacturing in 2026: How New Policies Are Shaping ESS Production and Factory Investment
2026-11-19
US Solar Manufacturing Is Expanding, But Is the Domestic Supply Chain Ready?
2026-11-09
Beyond Waste: How Lithium Battery Recycling Creates Environmental and Economic Value
2026-11-05
Lithium Battery Recycling Line: Basic Process and Equipment
2026-10-26
How a 100MW Fully Automatic Solar Module Production Line Works?
2026-10-24
How to Choose an Automatic 18650 Battery Welding Machine: A Complete Selection Guide
2026-10-20
ChinTiyan to Exhibit at REI Expo India 2026
2026-10-12
Prismatic vs. Cylindrical Battery PACK Production Lines: Key Differences
2026-10-08
ChinTiyan Joins Energy Storage Industry Exchange to Strengthen Industry Collaboration
2026-09-27