Double Glass Sealing Machine
Classification:
1.Fully automatic operation, manual tape loading required 2.Edge sealing method-full sealing: the component is fully sealed with tape on all four sides, no gaps can occur, and the overlapping part is more than 1mm. 3.The tape must be tightly applied, especially on the side of the component, and needs to be compacted. 4.Appearance of sealing edge: there shall be no wrinkles, wavy lines, breakage, tape collapse after lamination and other undesirable conditions Meet the double-glass and half-piece, stacked double-glass, 156-210 cell double-sided double-glass sealing requirements, while improving work efficiency, reducing production costs, to ensure product quality consistency. Automatically complete the double-glass module lamination before the workstation tape sealing process glass thickness 2.0~3.0mm, sealing length can be set freely according to process requirements.
Contact:
Details Introduction
1.Fully automatic operation, manual tape loading required
2.Edge sealing method-full sealing: the component is fully sealed with tape on all four sides, no gaps can occur, and the overlapping part is more than 1mm.
3.The tape must be tightly applied, especially on the side of the component, and needs to be compacted.
4.Appearance of sealing edge: there shall be no wrinkles, wavy lines, breakage, tape collapse after lamination and other undesirable conditions Meet the double-glass and half-piece, stacked double-glass, 156-210 cell double-sided double-glass sealing requirements, while improving work efficiency, reducing production costs, to ensure product quality consistency.
Automatically complete the double-glass module lamination before the workstation tape sealing process glass thickness 2.0~3.0mm, sealing length can be set freely according to process requirements.
Parameter
Equipment parameters
Beat |
≤25s |
|
|
Dimensions |
Length: 1650mm-2500mm Width: 900mm-1450mm |
Compatible Tape Lengths |
0~400m/roll |
Defective Rate |
Qualified components tested after sealing machine hidden crack/breakage rate combined ≤0.01%; glass damage: ≤0.01 |
|
|
Uptime Rate |
≧95% |
Keyword:
Double Glass Sealing Machine
Production Strength
What is the Warranty Period of ChinTiyan New Energy?
1.One year standard warranty from the date of completion installation & commissioning for the Full/Semi-Automatic Solar PV Module Production Line, or 13 months from the date of shipment whichever is earlier.
2.For the BOM List of Raw Materials for Full/Semi-Automatic Solar Panel Production Line, the Warranty Period is usually Six Months, especially Flux, Heating Oil and some other Chemicals and Dangerous Materials.
3.Free warranty for One Year (including Labor and Material fees, excluding Man-made Damage). Any losses caused by human misuse, abuse or improper maintenance are not covered by the warranty. Maintenance fees will be charged appropriately outside the warranty period.
What are the Main Differences Between Full-Automatic and Semi-Automatic Solar PV Module Production Line?
1.For the Full-Automatic Solar PV Module Production Line, there are more Automatic Solar Machines and Equipment in the Production Line, which could surely save more labors.
2.In the Full-Automatic Solar PV Module Production Line, there are also many Automatic Conveyors and Transmission Lines, which could help to transfer the Raw Materials from one process to the next process; But in the Semi-Automatic Solar PV Module Production Line, it needs labors to carry the unfinished Solar PV Modules from one process to the next process.
What is the Payment Terms of the Purchasement in ChinTiyan?
1. Once the Clients confirm the Final Prices of all the solar making machines and equipment, ChinTiyan New energy will send the Performa Invoice (PI) to the Clients. Clients should arrange 40%T/T deposit as the Down Payment, then ChinTiyan factory will start manufacturing all the Machines and Equipment.
2. During the Manufacture Process, Clients can come to ChinTiyan factory to inspect all the Solar Machines and Equipment if required. After inspection, Clients should arrange the rest 60% Balanced Payment Before Delievery or Shipment. ChinTiyan factory start to pack all the Solar Machines and Equipment, and deliver them to Clients. If Clients could not come to China for the inspection, ChinTiyan factory could send the Videos and Photos of all the Solar Machines and Equipment for Clients as reference.
What is the Policy of Installation, Commissioning & Training Services of ChinTiyan New Energy?
1. Workers and Technical Engineers of the Purchaser can come to ChinTiyan’s factory to get the most Professional One-by-one Training.
2. ChinTiyan New Energy may also send Engineering Team to the Purchaser's factory to train their workers during operation.
3. Remote training through Internet tools like Team-Viewer, Google Meet or other instant communication software.
Related Products