Hi-pot Insulation Withstand Voltage Tester
The PV module Hi-pot insulation withstand voltage tester is used to check the insulation safety of solar modules in production lines. It automatically positions the module and performs high-voltage testing with real-time monitoring and alarm protection to ensure product safety and quality.
Contact:
Details Introduction
The PV Module Hi-pot Insulation Withstand Voltage Tester is designed to verify the insulation performance and electrical safety of photovoltaic modules during production. The system automatically positions the solar module and performs a high-voltage insulation withstand test after energizing and grounding. By applying the preset test voltage, the Hi-pot tester checks the module for abnormal leakage or insulation conditions and provides an alarm when a test result falls outside the specified range.
Designed for integration into automated solar panel production lines, the insulation withstand voltage tester supports consistent electrical safety inspection with reduced manual intervention. The PV module tester can be used as part of the final testing process together with other module inspection equipment, helping manufacturers identify insulation defects before shipment. Its automated positioning, testing, and alarm functions make it suitable for high-volume PV module manufacturing and quality control.
Parameter
Insulation Withstand Voltage Tester
Item | Specification |
Applicable Module Size | Length: 1640-2500mm / Width: 950-1400mm |
Applicable Module Types | Conventional Modules, half-cell modules,double-glass modules |
Cycle Time | ≤ 22 seconds |
Maximum Production Capacity | ≥ 3,400 pcs / day |
Rated Power | 2.0 kW |
Air Pressure | 0.6 - 0.8 Mpa |
Overall Dimensions(L× W × H) | 3200 × 1850 ×1400 mm |
Equipment Weight | 980 kg |
Keyword:
Hi-pot Insulation Withstand Voltage Tester
Related Products
What is the Solar Panel Manufacturing Process?
Cells are loaded by an automatic loader. For half‑cut or third‑cut, cells go through a laser scribing machine for precise splitting. The cells are then fed into a stringer, where ribbons are soldered to form cell strings. After stringing, a bussing machine interconnects the strings, followed by layup, lamination, framing, junction box attachment, and final testing (EL and flash test). The stringer machine and laser scribing machine are the most critical pieces, they determine breakage rate and soldering quality.
How to Calculate Annual Energy Production From Solar Panels?
Simply multiply the total panel power (in kW) by the annual peak sun hours in your location, then apply a system efficiency factor, typically around 80%, to get a rough estimate. But from a manufacturing equipment perspective, what matters just as much is ensuring that processes like stringing and lamination don’t introduce micro‑cracks or poor soldering, because those issues will directly reduce the panel’s actual output.
Is BC technology the Future?
BC (Back Contact) technology is undoubtedly a key direction for next-generation high-efficiency PV modules. Its busbar-free front side offers not only superior aesthetics but also significantly reduces shading, leading to higher light absorption and increased power output. Rather than simply declaring BC as the only future,In fact, BC is a platform technology that can be combined with techniques such as Topcon HJT and perovskite tandem cells to squeeze out the last drop of efficiency gains.
Therefore, we believe BC technology will remain at the forefront of the upcoming technological transformation, making now the opportune moment to invest in BC.
What is Your Collaboration and After-Sales Process?
From project discussion to stable production, we provide complete technical support and long-term after-sales service to ensure a smooth and efficient cooperation experience.
1. Requirement Discussion
We communicate with you in detail to confirm product specifications, production capacity, factory conditions, and technical requirements, then provide a suitable production line solution.
2. Solution Confirmation & Contract
After confirming the technical proposal, both parties finalize the equipment configuration, layout, delivery schedule, and commercial agreement.
3. Equipment Manufacturing
While your factory prepares utilities and workshop conditions, we carry out equipment production, assembly, and internal testing.
4. Factory Acceptance Test (FAT)
Before shipment, customers can inspect and test the production line at our factory to verify equipment performance and operating conditions.
5. Shipment & Installation
The equipment is shipped to your factory, and our engineers provide on-site installation guidance and positioning support.
6. Commissioning & Site Acceptance
After installation, our engineers complete commissioning, parameter adjustment, and final testing to ensure the line operates according to agreed standards.
7. Training & Trial Production
We provide operation and maintenance training for your team and assist with trial production until stable operation is achieved.
8. Long-Term Technical Support
We provide continuous after-sales support, including remote assistance, spare parts supply, troubleshooting, technical upgrades, and maintenance support to ensure long-term stable production.