CT-1000 A+A+A+ Top-Illumination Solar Module IV Tester

The CT-1000 is a high-compatibility EL inspection system for solar modules. It uses upper and side lighting with an A+A+A+ light source for accurate testing of mainstream photovoltaic technologies.


Details Introduction


The CT-1000 Top-Illumination Solar Module IV Tester is designed for high-accuracy electrical performance testing of crystalline silicon solar modules. Featuring a direct top-illumination structure and an A+A+A+ solar simulator, this equipment provides reliable light simulation for precise IV curve measurement. With a spectral range of 300–1200 nm, it meets the testing requirements of various crystalline silicon PV modules.

 

Key Features

  • A+A+A+ Solar Simulation: Industry-leading spectral standard with a wide range of 300–1200 nm.
  • Top-Illumination Design: Direct-light structure with flexible top or side light source installation.
  • Accurate IV Measurement: Four-wire connection and high-speed data acquisition for reliable current measurement.
  • Infrared Temperature Measurement: Non-contact temperature monitoring for accurate temperature correction.
  • Wide Application: Suitable for electrical performance testing and quality inspection of crystalline silicon solar modules.

Parameter


A+A+A+top-level light

source standard.

Pulse duration
Electronic  load Irradiance
High  compatibility Upper Lighting mode

Keyword:

CT-1000 A+A+A+ Top-Illumination Solar Module IV Tester

What is the Solar Panel Manufacturing Process?

Cells are loaded by an automatic loader. For half‑cut or third‑cut, cells go through a laser scribing machine for precise splitting. The cells are then fed into a stringer, where ribbons are soldered to form cell strings. After stringing, a bussing machine interconnects the strings, followed by layup, lamination, framing, junction box attachment, and final testing (EL and flash test). The stringer machine and laser scribing machine are the most critical pieces, they determine breakage rate and soldering quality.

How to Calculate Annual Energy Production From Solar Panels?

Simply multiply the total panel power (in kW) by the annual peak sun hours in your location, then apply a system efficiency factor, typically around 80%, to get a rough estimate. But from a manufacturing equipment perspective, what matters just as much is ensuring that processes like stringing and lamination don’t introduce micro‑cracks or poor soldering, because those issues will directly reduce the panel’s actual output.

Is BC technology the Future?

BC (Back Contact) technology is undoubtedly a key direction for next-generation high-efficiency PV modules. Its busbar-free front side offers not only superior aesthetics but also significantly reduces shading, leading to higher light absorption and increased power output. Rather than simply declaring BC as the only future,In fact, BC is a platform technology that can be combined with techniques such as Topcon HJT and perovskite tandem cells to squeeze out the last drop of efficiency gains.

Therefore, we believe BC technology will remain at the forefront of the upcoming technological transformation, making now the opportune moment to invest in BC.

What is Your Collaboration and After-Sales Process?

From project discussion to stable production, we provide complete technical support and long-term after-sales service to ensure a smooth and efficient cooperation experience.

1. Requirement Discussion

We communicate with you in detail to confirm product specifications, production capacity, factory conditions, and technical requirements, then provide a suitable production line solution.

2. Solution Confirmation & Contract

After confirming the technical proposal, both parties finalize the equipment configuration, layout, delivery schedule, and commercial agreement.

3. Equipment Manufacturing

While your factory prepares utilities and workshop conditions, we carry out equipment production, assembly, and internal testing.

4. Factory Acceptance Test (FAT)

Before shipment, customers can inspect and test the production line at our factory to verify equipment performance and operating conditions.

5. Shipment & Installation

The equipment is shipped to your factory, and our engineers provide on-site installation guidance and positioning support.

6. Commissioning & Site Acceptance

After installation, our engineers complete commissioning, parameter adjustment, and final testing to ensure the line operates according to agreed standards.

7. Training & Trial Production

We provide operation and maintenance training for your team and assist with trial production until stable operation is achieved.

8. Long-Term Technical Support

We provide continuous after-sales support, including remote assistance, spare parts supply, troubleshooting, technical upgrades, and maintenance support to ensure long-term stable production.

Learn More ⇀