Double Glass Sealing Machine
Automatic double‑glass sealer (manual tape loading) applies full‑edge tape (>1mm overlap) on 2.0–3.0mm glass for 156–210mm modules, with ≤25s beat, ≤0.01% breakage, ≥95% uptime, and no wrinkles or tape collapse.
Contact:
Details Introduction
1.Fully automatic operation, manual tape loading required
2.Edge sealing method-full sealing: the component is fully sealed with tape on all four sides, no gaps can occur, and the overlapping part is more than 1mm.
3.The tape must be tightly applied, especially on the side of the component, and needs to be compacted.
4.Appearance of sealing edge: there shall be no wrinkles, wavy lines, breakage, tape collapse after lamination and other undesirable conditions Meet the double-glass and half-piece, stacked double-glass, 156-210 cell double-sided double-glass sealing requirements, while improving work efficiency, reducing production costs, to ensure product quality consistency.
Automatically complete the double-glass module lamination before the workstation tape sealing process glass thickness 2.0~3.0mm, sealing length can be set freely according to process requirements.
Parameter
Equipment parameters
|
Beat |
≤25s |
|
|
|
Dimensions |
Length: 1650mm-2500mm Width: 900mm-1450mm |
Compatible Tape Lengths |
0~400m/roll |
|
Defective Rate |
Qualified components tested after sealing machine hidden crack/breakage rate combined ≤0.01%; glass damage: ≤0.01 |
|
|
|
Uptime Rate |
≥95% |
||
Keyword:
Double Glass Sealing Machine
Related Products
What is the Solar Panel Manufacturing Process?
Cells are loaded by an automatic loader. For half‑cut or third‑cut, cells go through a laser scribing machine for precise splitting. The cells are then fed into a stringer, where ribbons are soldered to form cell strings. After stringing, a bussing machine interconnects the strings, followed by layup, lamination, framing, junction box attachment, and final testing (EL and flash test). The stringer machine and laser scribing machine are the most critical pieces, they determine breakage rate and soldering quality.
How to Calculate Annual Energy Production From Solar Panels?
Simply multiply the total panel power (in kW) by the annual peak sun hours in your location, then apply a system efficiency factor, typically around 80%, to get a rough estimate. But from a manufacturing equipment perspective, what matters just as much is ensuring that processes like stringing and lamination don’t introduce micro‑cracks or poor soldering, because those issues will directly reduce the panel’s actual output.
Is BC technology the Future?
BC (Back Contact) technology is undoubtedly a key direction for next-generation high-efficiency PV modules. Its busbar-free front side offers not only superior aesthetics but also significantly reduces shading, leading to higher light absorption and increased power output. Rather than simply declaring BC as the only future,In fact, BC is a platform technology that can be combined with techniques such as Topcon HJT and perovskite tandem cells to squeeze out the last drop of efficiency gains.
Therefore, we believe BC technology will remain at the forefront of the upcoming technological transformation, making now the opportune moment to invest in BC.
What is Your Collaboration and After-Sales Process?
From project discussion to stable production, we provide complete technical support and long-term after-sales service to ensure a smooth and efficient cooperation experience.
1. Requirement Discussion
We communicate with you in detail to confirm product specifications, production capacity, factory conditions, and technical requirements, then provide a suitable production line solution.
2. Solution Confirmation & Contract
After confirming the technical proposal, both parties finalize the equipment configuration, layout, delivery schedule, and commercial agreement.
3. Equipment Manufacturing
While your factory prepares utilities and workshop conditions, we carry out equipment production, assembly, and internal testing.
4. Factory Acceptance Test (FAT)
Before shipment, customers can inspect and test the production line at our factory to verify equipment performance and operating conditions.
5. Shipment & Installation
The equipment is shipped to your factory, and our engineers provide on-site installation guidance and positioning support.
6. Commissioning & Site Acceptance
After installation, our engineers complete commissioning, parameter adjustment, and final testing to ensure the line operates according to agreed standards.
7. Training & Trial Production
We provide operation and maintenance training for your team and assist with trial production until stable operation is achieved.
8. Long-Term Technical Support
We provide continuous after-sales support, including remote assistance, spare parts supply, troubleshooting, technical upgrades, and maintenance support to ensure long-term stable production.