Email: info@chintiyan.com
WhatsApp: +86-13125190225
Language
English
España
French
In 2026, solar panel production line upgrades are becoming an important consideration for manufacturers running older PV facilities. China’s new mandatory standards for PV products and manufacturing are also bringing more attention to production efficiency, product performance and process control ahead of 2027.
2026-09-24
In 2026, as the power battery and energy storage industries advance toward the terawatt era, selecting a prismatic battery PACK production line has become one of the most critical capital expenditure decisions for manufacturing enterprises.
2026-09-18
Before a lithium battery pack is shipped to the customer, it needs to pass a series of final tests to verify its safety, electrical performance, and communication functions. This final inspection is known as EOL (End-of-Line) testing and serves as the last quality checkpoint before the battery pack leaves the production line.
2026-09-15
From Cells to Energy Storage Systems — Uncovering the Automation, Laser Welding, and Intelligent Inspection Technologies Behind Prismatic Battery Pack Assembly Lines
2026-09-10
When selecting a solar cell stringer machine for a PV module production line, nominal speed is only one part of the decision. Cell technology compatibility, soldering accuracy, breakage rate, string yield, equipment availability, production-line integration and long-term operating cost all affect the actual output of a module factory.
2026-09-07
In August 2026, ChinTiyan completed the commissioning and acceptance of a semi-auto BIPV solar production line in South Korea. The project covers a complete production system for BIPV module manufacturing.
2026-08-31