Email: info@chintiyan.com
WhatsApp: +86-13125190225
Language
English
España
French
Prismatic and cylindrical batteries follow different manufacturing philosophies. Prismatic cells focus on space utilization and large-format integration, while cylindrical cells benefit from standardized formats and high-speed automated production.
2026-10-08
On September 22, 2026, ChinTiyan New Energy participated in an energy storage industry exchange meeting focused on strengthening collaboration across the battery and energy storage supply chain. The event brought together nearly 100 companies and industry representatives from areas including battery manufacturing, energy storage equipment, system integration, project development, engineering and research.
2026-09-27
In 2026, solar panel production line upgrades are becoming an important consideration for manufacturers running older PV facilities. China’s new mandatory standards for PV products and manufacturing are also bringing more attention to production efficiency, product performance and process control ahead of 2027.
2026-09-24
In September, the 8PPM highly automated lithium-ion battery module PACK line, custom-built by our company for HANLY Energy , completed production and in-house pre-commissioning; it was successfully shipped and has arrived at the customer's site. The line has now officially entered the equipment positioning and installation phase, marking the project's transition from manufacturing to on-site delivery and commissioning.
2026-09-21
In 2026, as the power battery and energy storage industries advance toward the terawatt era, selecting a prismatic battery PACK production line has become one of the most critical capital expenditure decisions for manufacturing enterprises.
2026-09-18
Before a lithium battery pack is shipped to the customer, it needs to pass a series of final tests to verify its safety, electrical performance, and communication functions. This final inspection is known as EOL (End-of-Line) testing and serves as the last quality checkpoint before the battery pack leaves the production line.
2026-09-15